Going UP?

The side door to the driveway has been replaced and a new landing built inside halfway down to the basement.

img_7772

I really like how open the new stair is at the basement level.  I originally though that I would add a wall of storage cubbies/hooks for shoes and coats inside this door.  Now I would love to leave it open with no railing but the village would never pass it on final inspection.  Hmmm… thinking… Tim and I will come up with something…

img_7773
Since the landing couldn’t be made any wider, we added a foot to its depth.
img_7786
Recycling the original floorboards from the attic for a little character.

Giving you little updates on the progress.  Sign up and follow to see the rest of this project.  It will be done soon. (click top right corner for the menu)

Advertisements

What do you think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s